ezeio2:userinterface:configuration:devices:driverlist:wattnode_adv

Description

This driver is designed for use with WattNode Modbus Module (WND) WattNode Modbus (WNC) and Multi-Circuit meter (MCM).


Settings

Name - The name is up to the user. Our suggestion is to choose a naming convention that makes the viewing the device list intuitive. Such as referring to the sensor and/or application. Keep the name short as it will be combined with the register name to create the default “Field” name (if added to “Fields”)

Active Check box - Check this box and “Save changes” to run the driver. The driver program can be suspended by unchecking the box and clicking on “Save changes”.

Notes - This space can be used to store information specific to the device, such as: location, wiring, scaling, etc.


Meter settings

Address - Enter the RTU device number (must be unique on the bus) or the last octet of the IP address, if connected via Ethernet/TCP

Module - Default setting is RTU for WattNode WND & WNC models. For Multi-Circuit Meter (MCM) select the corresponding Unit (circuit) number.

CT (A, B, & C) - Drop-down menus are provided for selecting CT ratings for each of the three phases metered.


Device status

Driver info -

Driver updated/version -

Battery & Signal -

Driver status -

Communication -


Available registers

  1. Total Energy (kWh)
  2. Total Power (kW)
  3. Power phase A (kW)
  4. Power phase B (kW)
  5. Power phase C (kW)
  6. Volt average ph-N (V)
  7. Volt phase A-N (V)
  8. Volt phase B-N (V)
  9. Volt phase C-N (V)
  10. Current phase A (A)
  11. Current phase B (A)
  12. Current phase C (A)
  13. Power factor average
  14. Power factor phase A
  15. Power factor phase B
  16. Power factor phase C
  17. Volt average L-L (V)
  18. Volt phase A-B (V)
  19. Volt phase B-C (V)
  20. Volt phase C-A (V)
  21. Total Energy NR (kWh) - Not resettable
  22. Positive Energy NR (kWh) - Not resettable
  23. Negative Energy NR (kWh) - Not resettable
  24. Energy phase A (kWh)
  25. Energy phase B (kWh)
  26. Energy phase C (kWh)
  27. Total Reactive Energy (kVAR h)
  28. Reactive Energy phase A (kVAR h)
  29. Reactive Energy phase B (kVAR h)
  30. Reactive Energy phase C (kVAR h)
  31. Reactive Power total (kVAR)
  32. Reactive Power phase A (kVAR)
  33. Reactive Power phase B (kVAR)
  34. Reactive Power phase C (kVAR)
  35. Total Apparent Energy (kVA h)
  36. Apparent Energy phase A (kVA h)
  37. Apparent Energy phase B (kVA h)
  38. Apparent Energy phase C (kVA h)
  39. Total Apparent Power (kVA)
  40. Apparent Power phase A (kVA)
  41. Apparent Power phase B (kVA)
  42. Apparent Power phase C (kVA)
  43. Reset Energy
  44. Frequency (Hz)
  • ezeio2/userinterface/configuration/devices/driverlist/wattnode_adv.txt
  • Last modified: 2022-02-04 22:52
  • by johpar